Bamboo Kitchen Construction | Complete in 10 days from the beginning
- Get link
- X
- Other Apps
Link: How to build bambo house kitchen | 10 Days start to finish (youtube.com)
Day 1: Preparation and Planning
- **Select location
- **Planning
- **Preparation of ingredients
Day 2-3: Build the Ribs
- **Laying the foundation
- **Hood frame assembly
Day 4-5: Roof Installation
- **Preparation of roof materials
- **Roof assembly
Day 6-7: Installing Walls and Doors
- **Fit
- **Installing doors and windows
Day 8: Interior Finishing
- **Design of the cooking area
- Seating and dining table arrangements: Place tables and chairs in the kitchen to create a dining space.
Day 9: Inspection and Repair
- Inspection of the whole project: Double-check the entire structure and details to make sure they are all sturdy and secure.
- Necessary repairs: Correct any minor errors detected during the inspection.
Day 10: Decorate and Finish
- Kitchen decoration: Decorate the kitchen with items and accessories to create a cozy and aesthetic space.
- Final Inspection: Check again to make sure everything is complete and ready to use.
Conclude
With just 10 days, you can build a bamboo kitchen that is fully equipped and aesthetically pleasing. This is not only an environmentally friendly building but also brings a living space close
- Get link
- X
- Other Apps
Comments
Post a Comment