Bamboo Kitchen Construction | Complete in 10 days from the beginning

 


Link: How to build bambo house kitchen | 10 Days start to finish (youtube.com)

Day 1: Preparation and Planning

  • **Select location
  • **Planning
  • **Preparation of ingredients

Day 2-3: Build the Ribs

  • **Laying the foundation
  • **Hood frame assembly

Day 4-5: Roof Installation

  • **Preparation of roof materials
  • **Roof assembly

Day 6-7: Installing Walls and Doors

  • **Fit
  • **Installing doors and windows

Day 8: Interior Finishing

  • **Design of the cooking area
  • Seating and dining table arrangements: Place tables and chairs in the kitchen to create a dining space.

Day 9: Inspection and Repair

  • Inspection of the whole project: Double-check the entire structure and details to make sure they are all sturdy and secure.
  • Necessary repairs: Correct any minor errors detected during the inspection.

Day 10: Decorate and Finish

  • Kitchen decoration: Decorate the kitchen with items and accessories to create a cozy and aesthetic space.
  • Final Inspection: Check again to make sure everything is complete and ready to use.

Conclude

With just 10 days, you can build a bamboo kitchen that is fully equipped and aesthetically pleasing. This is not only an environmentally friendly building but also brings a living space close 

Comments

Popular posts from this blog

Harvesting Ant Eggs, Making Chung Cakes and Fried Spring Rolls with Ant Eggs

Discover the riches of rediscovering lost gold! But the truth is disappointing

How to Build a Bamboo House Kitchen in 10 Days: A Step-by-Step Guide